Hours: Mon - Fri: 8.00 am - 6.00 pm
Steel frame of the Alibaba factory extension

FACTORY EXTENSION

Factory Extension

Grow Your Factory Without Moving Premises

When your factory runs out of space, extending is often faster and more affordable than moving. We expand, widen and raise existing factories with steel extensions that tie into your current building, planned in phases to keep your production running.

  • Lengthen, widen or raise your existing factory
  • Survey of the existing structure before design
  • Phased work to limit disruption to production
  • Careful tie-in to the existing roof, walls and gutters
Steel extension being added to an existing factory

30+ Years of Experience

400+ Projects Completed

Is It Time?

When Do You Need a Factory Extension?

If your current space is holding the business back, an extension can add room without the cost and disruption of relocating.

01

Running Out of Space

Production lines, stock or equipment no longer fit comfortably in the building.

02

New Production Line

New machinery or processes that need dedicated floor space next to your existing operation.

03

More Storage

Extra warehousing or loading space to keep raw materials and finished goods on site.

04

More Height Needed

Raising the roof for taller racking, cranes or machinery.

What’s Included

Our Factory Extension Services Cover

01

Site & Structure Survey

We check the existing frame, foundations, roof and drainage before planning the extension.

02

Extend, Widen or Raise

Lengthen the building, add a side bay or raise the roof to gain height.

03

Fabrication & Erection

Steel fabricated off-site and erected quickly to shorten time on site.

04

Roof & Wall Tie-in

Roofing, flashing, cladding and gutters detailed so the new and old buildings join watertight.

05

Phased to Keep You Running

Work zones, schedules and access planned around your production.

06

Full Supply & Install

Materials, fabrication, installation and clean-up handled by one team at one clear price.

How We Work

We Keep Every Project Simple & Clear.

01

Consultation & Site Visit

We discuss your needs and inspect the site to understand the full scope.

02

Quotation & Planning

You get one clear, all-inclusive quote and a work plan, with no hidden costs.

03

Execution & Construction

Our team carries out the work with quality materials and skilled workmanship.

04

Completion & Handover

We finish on schedule, clean up, and hand over a job built to last.

Our Work

Explore Our Factory Extension Work Showcase

Steel extension being added to an existing factory
Steel frame of the Alibaba factory extension
Workers on lifts assembling a steel structure
Steel portal frame of a factory under construction with a crane
Steel structure works
Steel structure of the Toyo Tyre factory under construction
Workers in safety gear climbing a steel roof structure

FAQ

Frequently Asked Questions

Workers in safety gear climbing a steel roof structure

In most cases, yes. With phased work, separated work zones and noisy tasks scheduled outside production hours, many factories keep operating throughout.

Sometimes. A survey and engineering check will show whether existing columns and foundations can take extra loads, or whether the extension needs its own independent frame.

Often, yes. Depending on the existing structure, the roof can be raised or a taller bay added to fit higher racking, cranes or machinery.

Yes. An extension normally needs plans prepared by qualified professionals and approval from the local authority before construction starts.

Ready to Extend Your Factory?

Tell us about your project and we’ll get back to you with a free, all-inclusive quote.